autodesk aec bimInfrastructure projects can include a wide range of stakeholders—from    designers, builders, and operators to owners, government agencies, and local    communities. Often, they’re located in severe geotechnical conditions, and so    must account for potential problems like landslides, mudflows, or soil    liquefaction. Using Building Information Modeling (BIM) and other technology,  IMCO Construction addresses these challenges on projects from highways and bridges to wharfs and wastewater plants. “Our projects can involve lots of stakeholders and extremely difficult working conditions,” says Brian Smith of IMCO Construction. “BIM helps us keep everyone looped in at all times—and manage everything from planning and scheduling to construction and operations—so we can meet tight deadlines while doing the job right.” Read More